Adelar Fire is the fire engineering arm of Adelar Facilities Management, providing impartial fire safety engineering across all RIBA stages to developers, architects, housing providers and building owners throughout the UK.
Our purpose is to help clients deliver buildings that protect life, preserve property and safeguard business continuity.
Adelar Fire delivers independent and impartial fire safety engineering across every RIBA stage, from strategic design and risk management through to the inspection and appraisal of buildings already in occupation. Our work is led by a chartered engineer, and every deliverable is issued under the name of the engineer responsible for it.
Adelar Fire is backed by the established compliance business of Adelar Facilities Management, with more than fifty years of combined management experience across security and fire. Clients benefit from a chartered-led team, accredited processes and the resources of a wider organisation, delivered with the responsiveness of a specialist consultancy.
Fire safety is among the most consequential investments made on a construction project, and among the least forgiving when the decision is deferred.
Demonstrable compliance with the Building Regulations and fire safety legislation.
A reduced likelihood of fire incidents, and a defensible position wherever liability is questioned.
Safe design, specification and installation supported throughout, rather than reviewed at the end.
Evidence that regulators, insurers, lenders and residents are able to rely on.
Risk mitigation planned early, while it is still measured in drawing revisions.
Deep fire safety experience combined with a broad range of services allows us to advise with authority from the earliest concept design, through the construction phase, and long after the building is handed over.
We work with organisations at every point in a building's life, from schemes still at concept stage through to portfolios that have been occupied for decades.
Comprehensive coverage from initial concept design, throughout the construction phase, and well beyond final handover.
Written to the guidance route the building needs.
Evidence and reasoning documented in full.
What is actually there, reported in priority order.
Where guidance alone cannot settle the design.
A fire strategy is not a single document issued once. It develops alongside the design, is verified during construction, and must be maintained throughout the building's operational life.
An early read on whether the scheme works. Height, escape provision and fire service access tested before the design is committed.
Guidance route selected and the strategy set at concept level, giving the architect the constraints to design around.
Coordinated with the other disciplines and issued with marked-up plans, in the form a Gateway 2 submission requires.
Fire resisting construction, door schedules, cavity barriers and systems interfaces, at the detail the contractor prices against.
Changes reviewed against the strategy, site queries answered, and inspection to confirm what is built matches what was approved.
As-built strategy, the golden thread information the building carries forward, and the risk assessment that takes over on occupation.
If your question is not addressed below, please contact us and we will answer it directly.
Where a building is higher risk under the Building Safety Act, a fire strategy is expected by the Building Safety Regulator at Gateway 2. Below that threshold it is not invariably mandatory, though building control bodies, warranty providers and insurers increasingly require one. In our experience, producing a strategy late is consistently more costly than producing it early.
A Fire Risk Appraisal of External Walls assesses the behaviour of external wall construction in a fire, applying the methodology set out in PAS 9980:2022. It is commonly prompted by a lender, an insurer, a funding application, or a fire risk assessment unable to resolve the question. If you are uncertain whether an appraisal is required, provide us with the building details and we will advise.
Yes, and it is a common instruction. We review the existing material before quoting and advise candidly whether it can be developed or should be reworked. We will not duplicate sound work in order to increase a fee, nor will we build upon documentation we consider unsound.
A technical note is typically a matter of days. Strategies and appraisals depend on the building, the information available and whether survey work is required. A programme is issued alongside the fee before you commit, and we notify you promptly if anything places it at risk.
Yes. We are based in the West Midlands with a presence in Nottingham and accept instructions nationally. Desk-based work is unaffected by location.
The address, the building type, its approximate height and the outcome you are seeking. Drawings are helpful but not essential at proposal stage. For existing buildings, please advise what documentation you currently hold.
We will confirm the scope of work, the fee, the programme and the engineer who will be responsible for it. Where an instruction falls outside our expertise, we will say so and direct you to a more appropriate provider.